Gunnison Copper Confirms High-Grade Massive Copper-Zinc-Silver Sulfides at Strong & Harris, including 40 Feet Grading 5.1% Copper and 12.0% Zinc
原披露日期:;精度:秒。
来源:SEC(SEC EDGAR 6-K)。
查看原始披露 ↗原文限定:A preliminary economic assessment ("PEA") was completed in March 2026 for the Gunnison Project yielding robust economics including an NPV8% of $2 billion, IRR of 22.5%, and payback period of 3.9 years. It is being developed as a conventional operation with open pit mining, heap leach, and SX/EW refinery to produce finished copper cathode on-site with direct rail link. The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
原文限定:For additional information on the Gunnison Project please refer to the technical report titled "Gunnison Project NI 43-101 Technical Report, Preliminary Economic Assessment, Cochise County, Arizona, USA" with an effective date of March 18, 2026 filed on SEDAR+ at www.sedarplus.ca.
原文限定:This news release contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward-looking information contained in this news release includes, but is not limited to, statements with respect to: (i) the intention to deploy the Nuton® technology at the Johnson Camp mine and future production therefrom; (ii) the continued funding of the stage 2 work program by Nuton; (iii) the details and expected results of the stage two work program; (iv) future production and production capacity from the Company's mineral projects; (v) the results of the preliminary economic assessment on the Gunnison Project; (vi) the exploration, development, optimization and permitting of the Company's mineral projects; (vii) the Company's ongoing metallurgical testing program, including flotation testing and evaluation of a potential concentrator processing route for sulfide mineralization; and (ix) the Company's customer and supply chain relationships.
原文限定:Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
标题保留原文的计划、申请、条件、初步结果及否定状态,以原文为准。本站核验来源归属、证券身份及披露时间,不保证公司陈述或投资价值。
核验记录与处理时间
来源原始时间字段:2026-11-10T19:04:00.000Z;日期依据:SEC accepted filing time (Atom and index checked); calendar date is America/New_York; not an inferred press-release time。
采集层首次发现:2026-11-10T19:15:30.246Z;事件路径观察:2026-11-10T19:15:38.061Z。
处理开始:2026-11-10T19:15:48.828Z;处理完成:2026-11-10T19:15:52.260Z;首次资格通过:2026-11-10T19:15:52.260Z;首次公开:2026-11-10T19:15:52.260Z。
公开模式:natural_new;处理方式:automatic;规则版本:sec_company_events_v3_filed_release;自然时槽:2026-11-10T19:15:23.513Z。
保留原始披露及首次时间,重新展示不重写发布时间。
身份核验记录:2026-11-10T19:15:50.215Z;来源核验记录:2026-11-10T19:15:50.215Z。